Thursday, October 27, 2011

Design Charette Project

I learned all of the roles for building of a project.  I liked drawing the picture, and also coming up with a design for the new building.  I did not like having to create it with such a large group of people, who were all not reliable.  I would have chosen a different job in our project to do that would be more fun.

Notes:


Danny Langevin- Architect
Andrew Rohkohl- Architectural Engineer
Joe Siddy- Buildin
Michael Sidell- Cost Estimator
Joe Doran- Civil Engineer
Darshan Padmanabhan- Structural Engineer

Goals for Restoration

Structural Engineer:

  1. The building must be able to withstand the forces of nature that will be applied to it.
  2. The building must be able to stand on its own.



Architect:
  1. Restore the Farmhouse.
  2. Make sure restoration meets the original design/look



Architectural Engineer:
  1. To make sure that the original design of the house remains intact
  2. To make sure that the construction does not harm the original house
  3. To make sure the restoration is done without harming the house
  4. To maintain the house to its original image
  5. To make sure that the structure of the house is stable



Building Inspector/Code Enforcement Officer:
  1. Make sure plumbing is up to code
  2. Make sure wiring is up to code
  3. Make sure heating/cooling systems are up to code
  4. Make sure building has adequate entrances and exits that are up to code
  5. Make sure foundation of the building is stable



Civil Engineer:
  1. What is it going to look like?
  2. What materials are going to use?
  3. How are we going to make it safe?
  4. How can we use the building the way it is to make it better?
  5. What color paint are we going to use?



Cost Estimator: "We have an unlimited amount of money in our budget due to the fact that It is government funded.”
  1. What needs to be rebuilt?
  2. What materials could we afford to use rebuilding?
  3. Can we afford to rebuild it all? YES
  4. Are there any parts that can go without rebuilding for right now?
  5. Do we have enough money and time to rebuild previous renovations that were done poorly?



Common Goals

Exterior:

Reside the entire building
Replace the windows
Repaint entire building
Re-enforce structural elements of house
Fix sagging roof, if not able to install a NEW roof

Interior:

Repaint interior to as close to as old color as possible
Sand and resurface floors
Replace rotten wall

Inspector/Code Enforcement Officer